Volkswagen and Northvolt building 16 GWh Battery Production in Salzgitter Germany

Volkswagen and Northvolt form joint venture for battery production

>  The goal is to build a factory for lithium-ion batteries in Salzgitter (Lower Saxony)

>  Start of production is planned for the end of 2023/beginning of 2024

>  Initial annual output to be 16 GWh

Volkswagen AG and Northvolt AB have created a 50/50 joint venture to build a factory for lithium-ion batteries. Construction of the production facility is scheduled to start in Salzgitter (Lower Saxony) in 2020. Start of production is planned for the end of 2023/beginning of 2024. The initial annual output is to be 16 GWh.